Modern issue tracking and project management

For Mac
Official website
Free + paid plans

Our review

4.7/5

Bundl editorial assessment

How we review apps

Linear in November 2026 is still the default modern issue tracker for product-engineering teams that value speed: Free for evaluation, Basic at $10, Business at $16, and a serious agent story on top, now including bring-your-own-key for the cloud coding agent on all current plans and coding sessions at provider token rates. The Free 250-issue cap and annual paid billing are the main frictions. If you need Jira-level flexibility, look elsewhere. If you want low tracker latency and agents in the loop, Linear remains outstanding.

Best for

  • Startup and scale-up engineering teams
  • Product teams that want keyboard-fast issue tracking
  • Orgs adopting agent-assisted triage and coding sessions
  • Teams migrating off slow Jira workflows

What is Linear?

Linear is a modern issue tracker and product delivery platform for software teams that prefer speed over endless configuration. It syncs data for a local-first feel, leans hard on keyboard workflows, and pairs issues with projects, cycles, initiatives, plus an expanding agent platform. As of November 2026 Linear reports trust from more than 40,000 companies and keeps pushing AI: Linear Agent, triage intelligence, coding sessions, loops, and MCP access show up across marketing and CEO/COO updates. Some AI features are metered via AI credits instead of a flat AI seat tax, and the 2026 changelog kept refining that model: coding sessions bill at provider token rates with no markup, the sandbox runtime costs $0.25 per 20-minute block with admin spend limits, and since 12 November 2026 bring-your-own-key for the cloud coding agent is available on all current plans, with provider usage billed by the provider. Pricing on linear.app/pricing (verified November 2026): - Free, $0: unlimited members, 2 teams, 250 issues, agent platform / Linear Agent entry points, 10MB file uploads. - Basic, $10 per user/month (billed yearly): 5 teams, unlimited issues, unlimited uploads, admin roles. - Business, $16 per user/month (billed yearly): unlimited teams, private teams & guests, Triage Intelligence, Loops, Code Intelligence (beta), Insights, Asks, support integrations (Zendesk/Intercom). - Enterprise, custom: SAML/SCIM, advanced security/admin, invoice/PO, priority support, migration help. Older content that still says Standard $10 / Plus $15 is stale. The public ladder is Free / Basic / Business / Enterprise. Paid plans are shown as yearly billing on the marketing page; AI-heavy features may consume AI credits. On Mac, Linear's desktop and web clients feel at home on Apple Silicon: the desktop app is a universal build (current version 1.32.8, released 2026-10-30), and Homebrew pours it as the linear cask (the token was renamed from linear-linear). Competitors include Jira, GitHub Issues, Height, Asana, Shortcut, and newer agent-native trackers. The 2026 community story is less 'pretty Jira' and more 'issue tracker as software factory': agents file issues, triage queues, and open coding sessions from customer conversations. Honest take: if you are a product-engineering team that wants opinionated workflows and will pay $10-$16/user for speed, Linear is still best-in-class. If you need infinite workflow configuration, deep ITSM, or free unlimited issues at scale, Jira or GitHub may fit better. Watch the 250-issue Free cap; active teams hit it quickly.

Install with Homebrew

brew install --cask linear
Official Website

Analysis: Linear's approach to modern software delivery

Linear grew by rejecting the heavy issue-tracker template. It ships an opinionated, fast, developer-centered product instead of a configurable portal for every process. This section covers the product philosophy, how the cloud clients stay quick, the integration surface, and where the roadmap is heading in 2026.

History & Background

Linear was founded to cut friction in software delivery and to build a tool developers would actually enjoy opening. Startups and high-growth companies adopted it quickly because the UI felt modern and stayed fast, which made it a credible alternative to established trackers without a multi-month rollout.

How It Works

Linear is a cloud application with real-time sync across web, desktop, and mobile clients. The product bets on modern web stacks and efficient data sync so updates feel near-instant. Desktop and mobile apps add native windowing and mobile triage rather than replacing the cloud source of truth.

Ecosystem & Integrations

The ecosystem is built on native integrations and an active user community. GitHub covers code, Figma covers design handoff, and Slack covers chat-adjacent updates, so work stays in one issue graph. An open GraphQL API lets teams extend Linear with internal bots, custom fields plumbing, and agent tooling such as community MCP servers.

Future Development

Recent public messaging leans into AI-powered workflows and agents, sometimes framed as a path toward more automated SaaS operations. Updates around advanced filters, Linear MCP for product work, and Time in Status show continued investment in core PM and engineering-leader needs alongside the agent story. The late-2026 changelog centers on the coding agent: provider token rates with no markup plus a $0.25 per 20-minute sandbox block arrived 20 August 2026, new controls with adaptive routing to a faster model on 24 September 2026, and bring-your-own-key on all current plans on 12 November 2026.

Key Features

Fast Local-First Issue Tracking

Linear's hallmark remains snappy navigation, instant search, and keyboard-first issue creation, the reason teams leave slower trackers.

Projects, Cycles & Initiatives

Structure work from roadmap initiatives down to cycle-based execution without Jira-level workflow archaeology.

Agent Platform & Linear Agent

Available even on Free for entry agent workflows. Business adds deeper intelligence (Triage Intelligence, Loops, coding sessions) with credit-based AI usage for some capabilities. The 2026 changelog adds new coding-agent controls, adaptive routing of simpler tasks to a faster model (24 September 2026), and bring-your-own-key for the cloud coding agent on all current plans (12 November 2026), with the sandbox runtime billed in Linear AI credits.

GitHub/GitLab Sync & Diffs

Keep PRs and issues aligned; review diffs and ship with less status theater.

Triage, SLAs & Asks

Route inbound work, apply triage rules, and on Business use Asks/intake from Slack/email/web forms for support-style queues.

Insights and Reporting (Business+)

Linear Insights and dashboards for teams that outgrew spreadsheet status reports, without turning into full BI.

Admin, SSO & Enterprise controls

Basic adds admin roles; Enterprise adds SAML/SCIM, IP restrictions, audit logs, and advanced org modeling.

Native Mac-Friendly Client

Desktop/web UX tuned for keyboard users on macOS, including Apple Silicon machines common on modern engineering teams.

Customer Requests & Integrations

Capture customer requests and integrate chat/support tools so product work stays connected to revenue conversations.

Who Should Use Linear?

Software Engineer

An engineer jumps issues with keyboard shortcuts and custom filters, then updates a bug in markdown and marks it done without leaving the keyboard. Search stays instant even in busy workspaces, so finding a known regression does not become a scavenger hunt.

Product Manager

A product manager tracks feature progress across teams against the roadmap. Projects group related issues, milestones stay visible, and automated status updates keep the plan honest without weekly status-doc archaeology.

Scrum Master/Team Lead

A scrum master plans capacity inside time-boxed Cycles, watches load mid-cycle, and rolls unfinished work forward automatically. Retrospectives use cycle history instead of a separate spreadsheet of what slipped.

Design Team Member

A designer links UI work to engineering issues through the Figma integration and attaches design files on the Linear issue itself. Engineers open the latest frame without hunting Slack threads for the 'final final' link.

Customer Support Agent

A support agent escalates Intercom or Zendesk tickets into engineering bugs. Linear Asks turns those external requests into structured issues so feedback does not die in a shared inbox.

How to Install Linear

Linear runs in the browser and also ships desktop and mobile clients. Pick the surface that matches how you work; most teams start on the web, then add the Mac app for a dedicated window.

1

Access via Web Browser

Open linear.app in Chrome, Firefox, Edge, or Safari. Linear is cloud-hosted, so web access needs no install and is available as soon as you sign in.

2

Download Desktop Clients

Download the native desktop app for macOS (a universal build for Intel and Apple Silicon; the current version is 1.32.8, released 2026-10-30) or Windows when you want a dedicated window. Homebrew installs the Mac app with brew install --cask linear, the cask token renamed from linear-linear to linear, so update older scripts; the cask requires macOS 13 or later and the app updates itself automatically. Desktop clients often feel snappier and include offline-friendly behavior for short disconnects.

3

Install Mobile Apps

Install Linear from the Apple App Store (iOS) or Google Play (Android) for triage on the go. Mobile clients cover core task management so you can review or reassign work away from a desk.

Pro Tips

  • • Use the web app when you are on a shared machine and do not want another install.
  • • Prefer the desktop app if you want a focused window and better behavior offline for brief network blips.
  • • Tune mobile navigation for the queues you check daily so triage does not mean endless scrolling.

Configuration Tips

Learn the keyboard map early

Linear assumes you will live on shortcuts. Spend a session learning create, search, assign, and status keys so you stop reaching for the mouse on routine issue work.

Build views that match real queues

Custom views and filters beat one shared backlog. Filter by team, label, project, or priority, then pin the boards or lists you open every morning.

Automate the boring status work

Use issue templates and automated status rules for bugs and recurring request types. That keeps fields complete and frees people from copy-paste hygiene.

Treat Cycles as real capacity, not theater

For agile teams, set cycle length, use capacity planning, and let automatic rollover move unfinished work. Overstuffed cycles are a process smell Linear will not hide for you.

Alternatives to Linear

Linear competes with both legacy ITSM-style trackers and lightweight GitHub-centric workflows.

J

Jira

Maximum configurability and enterprise ecosystem. Heavier and slower. Choose Jira for complex ITSM/workflow politics; Linear for product engineering speed.

G

GitHub Issues

Free and adjacent to code. Weaker product planning/cycle UX than Linear. Good for small open-source; Linear wins multi-team product orgs.

H

Height

Flexible autonomous product workspace. Consider if you want different automation metaphors than Linear's opinionated model.

A

Asana

Broader work management for non-eng teams. Linear stays more developer-native.

S

Shortcut

Engineering-focused tracker alternative with different pricing/UX tradeoffs.

P

Plane / open-source trackers

Self-hosted options for teams that cannot put issues in SaaS. More ops overhead than Linear.

Pricing

Freemium per-user subscription (annual on paid tiers)

Verified against linear.app/pricing in November 2026. - Free ($0): Unlimited members; 2 teams; 250 issues; agent platform & Linear Agent; 10MB uploads; core issues/projects/cycles/initiatives. - Basic ($10/user/month, billed yearly): 5 teams; unlimited issues; unlimited uploads; admin roles; all Free features. - Business ($16/user/month, billed yearly): Unlimited teams; private teams & guests; Triage Intelligence; Loops; Code Intelligence (beta); Insights; Asks; Zendesk/Intercom integrations; advanced AI/agent workflows (some require AI credits). - Enterprise (custom, annual): SAML & SCIM; granular admin; advanced security; invoice/PO; migration & onboarding support; priority support; account management. Notes: Marketing emphasizes yearly billing for paid seats; Enterprise is annual billing only. Agent and coding-session usage is metered rather than flat: coding sessions bill at provider token rates with no markup, the sandbox runtime costs $0.25 per 20-minute block and uses Linear AI credits, and admins can set spend limits. Since 12 November 2026, bring-your-own-key for the cloud coding agent is available on all current plans, with provider usage billed by the provider. Confirm AI credit docs when budgeting agent automation.

Pros

  • Snappy local-first UI with very low perceived latency
  • Developer-first design that matches how engineering teams actually ship
  • Deep keyboard shortcuts for navigation, create, and updates without the mouse
  • Automation and agent workflows cut repetitive triage work
  • Solid integrations with GitHub, Slack, Figma, Sentry, Zendesk, and Intercom
  • Linear Agent, triage intelligence, loops, and related AI features on paid tiers
  • Cycles and Projects cover sprint execution without a second tool
  • Keyboard-first UX that feels native on Mac engineering laptops

Cons

  • No built-in time tracking; you need a third-party integration
  • No native public roadmap; public visibility needs an external tool
  • Weaker fit for non-software teams than general-purpose PM tools
  • Less workflow customization than Jira-class systems
  • Primarily cloud-based; desktop apps help offline, but it is not a full offline-first product
  • Free plan capped at 250 issues and 2 teams
  • Paid tiers marketed with yearly billing

Community & Ecosystem

Linear has a large following among startups and high-growth tech companies, especially on engineering, product, and design teams. Thousands of organizations use it for daily development work. Native integrations cover GitHub, Slack, Figma, Sentry, Zendesk, and Intercom. A GraphQL API lets developers build custom integrations and glue Linear into internal tools. The Linear community Slack group has thousands of active members trading workflow tips and integration ideas. The official changelog and blog ship regularly with new features, performance notes, and roadmap updates. Community projects such as linear-mcp and linear-sync push the platform into automation and AI agent setups beyond the stock product.

Video Tutorials

Getting Started with Linear

Linear59.0K views

More Tutorials

Linear App Tutorial For Beginners (2025) | How To Use Linear App

Speak About Digital • 17.3K views

How to create an s-curve combo chart in #excel #exceltips #exceltricks

Excel Up North • 749.0K views

I EDITED THIS VIDEO FOR THARUN SPEAKS #shorts #tutorial #editing

Naman Aggarwal • 259.0K views

Frequently Asked Questions about Linear

How much does Linear cost in 2026?
Free is $0 with 2 teams and 250 issues. Basic is $10/user/month and Business is $16/user/month, both presented as billed yearly on Linear's pricing page. Enterprise is custom.
What happened to Standard and Business plans?
Public pricing now lists Free, Basic, Business, plus Enterprise. Older references to Standard ($10) and Plus ($15) are outdated naming and price points.
Does Free really limit issues to 250?
Yes. Free includes unlimited members but caps issues at 250 and teams at 2. Active startups often hit the issue cap first.
What AI features does Linear include?
Linear markets an agent platform and Linear Agent widely. Business adds Triage Intelligence, Loops, plus Code Intelligence. Coding sessions bill at provider token rates with no markup, the sandbox runtime costs $0.25 per 20-minute block and uses Linear AI credits, and since 12 November 2026 the cloud coding agent accepts your own provider key on all current plans, with provider usage billed by the provider.
Is Linear good for non-engineering teams?
It can work for design/product partners, but it is optimized for software delivery. Marketing-led orgs may prefer Asana/Monday-class tools.
Linear vs Jira?
Linear optimizes for speed and opinionated workflows; Jira optimizes for configurability and enterprise process. Teams leaving Jira cite performance and complexity; teams staying cite workflow depth and marketplace apps.
Does Linear work well on Mac?
Yes. Keyboard-first desktop/web clients are popular on Apple Silicon MacBooks used by engineering teams.
Are paid plans monthly or yearly?
The public pricing page emphasizes per-user/month prices billed yearly for Basic and Business, and Enterprise is annual billing only. Confirm contract terms in-app before purchasing.
What is Linear Asks?
Business-tier intake tooling for bringing requests from Slack, email, or web forms into Linear with configuration per channel.
Do AI credits expire?
Linear's public messaging has emphasized clear token-based credits without monthly AI seat fees; read the current AI credits docs for expiry/rollover rules before budgeting.
Can I install Linear on my Mac with Homebrew?
Yes. Run brew install --cask linear. The Homebrew cask token was renamed from linear-linear to linear, so update older scripts or docs that still reference the former token; the app itself did not change. The cask requires macOS 13 or later and ships the current universal desktop build, version 1.32.8 (released 2026-10-30), which updates itself automatically.
How do I download Linear for Mac?
Linear's Mac app downloads from linear.app, and Homebrew installs the same app with brew install --cask linear. Linear's current desktop version is 1.32.8 (released 2026-10-30), a universal build for Intel and Apple Silicon. The Linear cask on Homebrew requires macOS 13 or later, and the app updates itself automatically.
What is the Linear app?
Linear is an issue tracker for software teams that also covers product delivery: projects, cycles, initiatives, and an agent platform for triage and coding sessions. Linear runs on the web, a universal Mac desktop app, and mobile clients.

About the Author

Jordan Kim

Productivity & Workflow Analyst

Productivity ApplicationsNote-Taking & Knowledge ManagementTask & Project Management
8+ years in operations management · PMP certified

Expert Tips for Linear

1

Linear's 2026 story on X is about agents merging dozens of fixes weekly from triage, buyers should budget AI credits alongside seat cost, not assume agents are unlimited on Business. Current published numbers anchor that budget: coding sessions cost provider token rates with no markup, the sandbox runtime is $0.25 per 20-minute block with admin spend limits, and since 12 November 2026 bring-your-own-key shifts provider usage onto your own provider bill while the sandbox runtime keeps using Linear AI credits.

Hands-on TestingHigh Confidence
2

The Free plan's 250-issue ceiling is the most common 'surprise bill' trigger called out in alternatives content; treat Free as evaluation, not a long-term home for active multi-squad orgs.

Official DocsHigh Confidence

Related Technologies & Concepts

LinearJiraGitHubAI AgentsCyclesLinear AsksLinear AgentAI creditsApple Silicon
Linear (Core Platform), Jira (Alternative Project Management), GitHub (Version Control), AI Agents (Workflow Automation), Cycles (Agile Sprints), Linear Asks (Request Management), Linear Agent (Built-in agent capability for triage and coding sessions), AI credits (Metering unit for some Linear agent/AI features), Apple Silicon (Mac hardware platform common among Linear users)

Related Topics

Agile Project Management

How Linear supports agile delivery with Cycles (sprints), capacity planning, and cycle history useful in retrospectives.

Developer Productivity Tools

Keyboard-first navigation, issue tracking, and developer-tool integrations that cut context switching for engineers.

AI in Project Management

How Linear Agent, triage intelligence, loops, and credit-metered automations change product development chores.

Cross-Functional Collaboration

How Linear connects engineering with product and design through shared projects, Figma links, and support intake via Asks.

Sources & References

Fact-Checked

Last verified: Aug 9, 2026

Key Verified Facts

  • Linear Free includes unlimited members, 2 teams, and 250 issues; Basic is $10/user/month and Business $16/user/month billed yearly.[1]
  • Business adds unlimited teams, private teams/guests, Triage Intelligence, Loops, Insights, Asks, plus related AI/agent features.[1]
  • Linear's leadership publicly describes agent triage-to-fix workflows with token-based AI credits rather than a separate flat monthly AI fee.[5]
  • Independent 2026 pricing write-ups corroborate the Free 250-issue cap and $10/$16 paid tiers.[2][3]
  1. 1
    linear.appLinear pricing

    Accessed Nov 16, 2026

    Source excerpt
    Free/Basic $10/Business $16/Enterprise matrix and feature grid.
  2. 2
    lifestack.aiLinear pricing overview 2026

    Accessed Aug 9, 2026

    Source excerpt
    Documents Free 250 issues, Basic $10, Business $16.
  3. 3
    usecarly.comLinear pricing closer look July 2026

    Accessed Aug 9, 2026

    Source excerpt
    Confirms yearly billing presentation and tier limits.
  4. 4
    codegen.comLinear alternatives 2026

    Accessed Aug 9, 2026

    Source excerpt
    Competitive context and Free cap friction.
  5. 5
    x.comKarri Saarinen on Linear agents (X)

    Accessed Aug 9, 2026

    Source excerpt
    CEO update on agent-generated fixes and credit-based AI usage.
  6. 6
    linear.appLinear docs, assigning issues / agents

    Accessed Aug 9, 2026

    Source excerpt
    Product documentation for agent assignment workflows.
  7. 7
    x.comPeter Yang on Linear agents

    Accessed Aug 9, 2026

    Source excerpt
    Community explanation of agentized product development in Linear.
  8. 8
    linear.appChangelog – Linear

    Accessed Nov 16, 2026

  9. 9
    releases.linear.appLinear 1.32.8 universal disk image

    Accessed Nov 16, 2026

  10. 10
    formulae.brew.shHomebrew cask linear

    Accessed Nov 16, 2026

  11. 11
    formulae.brew.shHomebrew cask linear page

    Accessed Nov 16, 2026

Research queries: Linear app features; Linear pricing tiers; Linear alternatives Jira; Linear AI workflows; Linear mobile app; Linear changelog 2026; Linear integrations

Compare Linear

Linear is a Free Alternative

Linear can replace these paid apps:

Browse all free alternatives

More Productivity

View all

Featured in Collections

Explore More on Bundl

Related Reading

Compare Linear

Free Alternatives

Similar Apps

Similar Apps

Read our complete guide to the best productivity for Mac