Height
All-in-one project management tool
Install with Homebrew
brew install --cask heightQuick Take: Height
Height is discontinued. Final service was September 24, 2025. Do not adopt it for new Mac workflows in 2026. Migrate archives to Linear, Asana, Notion, or Shortcut and remove residual desktop/OAuth artifacts. The low rating reflects total unavailability, not the historical design quality, which was strong while the service ran.
Best For
- •Nobody for new deployments in 2026
- •Historical reference and migration planning only
What is Height? - Discontinued Project Management App (2026 Status)
Height is a discontinued AI-powered project management and team collaboration platform. It is not available as a living product for Mac users in August 2026. Height shut down on September 24, 2025 after announcing the wind-down in March 2025 via its official channels (including @height_app on X). The company had raised on the order of $18M, spent years building a polished task-plus-chat product, and late in its life repositioned around autonomous project management, AI triage, backlog pruning, and specification upkeep. Those cloud services stopped with the final day of service. Any remaining macOS desktop builds cannot restore team workspaces, AI automation, or Git sync without Height's backend. This page stays online because search demand and outdated comparison articles still send Mac buyers to Height. Readers deserve a clear answer first: do not adopt Height for new work. If you used it historically, complete decommissioning (uninstall, revoke OAuth, preserve offline exports) and migrate to actively maintained tools such as Linear, Asana, Notion, or Shortcut. Design quality while Height was alive was widely admired; availability and support in 2026 are zero. Competitively, Height tried to sit between Linear's engineering focus and broader work OS tools, differentiating with agent-style automation rather than another kanban skin. Linear's momentum, crowded AI PM messaging, and the cost of shipping autonomy features all form the public narrative around why the product could not continue. No acquisition that keeps Height online has been announced as of this refresh. From a macOS operations perspective, the important artifacts are residual: Dock icons, Login Items, keychain passwords, and GitHub OAuth grants. Cleaning those is a fifteen-minute admin task that closes a quiet security gap. From a product strategy perspective, Height is a case study in how far design and AI narrative can carry a tool, and how quickly the market moves on once the servers stop.
Height close look: from autonomous PM bet to shutdown
## What Height was Height combined issue tracking, task chat, multi-view boards, and Git-aware automation into a single product aimed at product and engineering organizations. Its late product narrative centered on autonomy: less time grooming backlogs, triaging bugs, and reconciling specs with shipped code. That story resonated in a market flooded with AI chat bolted onto legacy trackers, even though the company ultimately could not convert differentiation into a durable business. ## Timeline that matters for Mac buyers - Public product era: roughly three and a half years of general availability after years of building. - March 2025: official shutdown communication, including the @height_app post stating final service on September 24, 2025. - September 24, 2025: final day of service, cloud access and collaboration ended. - August 2026: no revived service, no supported macOS client backend, residual search demand from outdated roundups. ## Security hygiene after a SaaS death Discontinued tools leave OAuth grants, local binaries, and shared passwords lying around. Treat Height like any other vendor exit: revoke GitHub/GitLab apps, remove Height.app, clear Login Items, and document the sunset date in your vendor inventory. If an MDM still pushes Height, delete the package definition. ## Migration patterns that worked for teams Teams that finished before the final day typically: (1) exported issues and comments, (2) remapped statuses to Linear or Shortcut workflows, (3) rebuilt Git automation, (4) archived chat-heavy context into Notion pages where decisions still mattered. Teams that waited until after the final day had fewer export options and more reconstruction work. ## Why this page still exists bundl.run keeps discontinued apps when search demand and Mac install leftovers create real user questions. Honest status is better for E-E-A-T than pretending Height is a 2026 contender. If you arrived from a "best AI project management tools" list written before March 2025, update your shortlist immediately. ## Feature archaeology (what reviews used to celebrate) Contemporary reviews before the shutdown repeatedly praised three pillars: visual design, speed of the desktop client on Apple Silicon, and the ambition of autonomous workflows. Bug triage demos showed incoming issues classified without a human first-pass. Backlog pruning demos showed months-old tickets surfaced with suggested dispositions. Spec-sync demos promised that PRDs would not rot the week after launch. Those demos were not fictional, they required continuous model evaluation, integration maintenance, and customer success effort that a Series A-scale company can struggle to fund against better-capitalized or more focused competitors. ## Competitive landscape that outlived Height By August 2026 the Mac-friendly project management field is dominated by living products: Linear for eng/product craft, Asana and Monday.com for portfolio-style work, Notion and ClickUp for flexible databases, Jira for enterprises already standardized on Atlassian, and Todoist/Things for personal execution. AI features now appear across nearly every tier of those products. Height's differentiation, being early to brand autonomy, did not create a moat once larger vendors shipped "AI teammates" and agents. Buyers should evaluate agents on auditability, data residency, and export, not on launch videos. ## Practical migration matrix | Height concept | Linear | Asana | Notion | | --- | --- | --- | --- | | Issues / tasks | Issues | Tasks | Database rows | | Projects | Projects | Projects | Full-page databases | | Task chat | Comments / Slack | Comments / Slack | Page comments | | Git auto status | GitHub/GitLab sync | Limited | Via integrations | | AI triage | SLAs + triage intelligence | Rules + AI | AI autofill / agents | | Mac app | Excellent | Good | Good | Use the matrix as a conversation starter with your team, not as a one-click converter. Field names, custom statuses, and automation side effects always need human mapping. ## Lessons for bundl readers 1. Status beats marketing. If a page ranks for "Height Mac app" in 2026, lead with discontinued, not feature poetry. 2. Desktop apps are not backups. Local UI without API access is not an offline mode. 3. Export while happy. The worst time to learn export limits is after a shutdown email. 4. OAuth rot is real. Dead vendors leave live tokens; revoke them. 5. Search demand lingers. Honest discontinued pages still help users and protect trust. ## What "autonomous project management" should mean now If a vendor claims autonomy in 2026, ask: Which actions can the agent take without approval? Where is the audit log? How do you disable it per project? What models power it today (not last year)? How do you export both tasks and agent decisions? Height's story is a reminder that autonomy marketing is easy and durable operations are hard.
Key Features
Autonomous Bug Triage (historical)
While Height was live, AI triage categorized, prioritized, and routed bug reports, learning from team corrections. Severity suggestions and duplicate detection aimed to shrink weekly triage meetings for eng leadership. That pipeline was server-side and ended with the September 2025 shutdown. Teams that valued automated intake now look at Linear triage rules, Jira automation, or specialized support tools rather than any Height remnant.
Backlog Pruning Automation (historical)
Height flagged stale backlog items and suggested close, refresh, or reprioritize actions so product orgs avoided endless zombie tickets. Humans retained approval control. After shutdown, similar hygiene is usually a scheduled Linear view, a Notion database filter on last-edited date, or a custom script against your tracker API.
Specification Auto-Updates (historical)
Linked product specs could be nudged when code, PRs, or discussions changed, reducing documentation drift, a real pain for continuous delivery teams. The feature depended on Height's cloud AI and integrations. Replacements in 2026 include code-aware agents that open documentation PRs, Notion AI summaries, or disciplined PR templates that require doc updates.
Task-Embedded Real-Time Chat (historical)
Each task carried threaded chat so requirements and decisions lived next to the work item instead of vanishing into Slack. Searchable history and message-to-task conversion were core to the pitch. Chat transcripts lived in Height's cloud; if you did not export before September 24, 2025, reconstruction means tribal knowledge and email archaeology.
Git Auto-Sync (historical)
GitHub and GitLab links could move task status when branches opened or PRs merged, cutting manual board grooming. After shutdown, reconnect repositories in your new tracker and revoke Height OAuth apps so abandoned tokens do not linger with repo access.
Flexible Views & Customization (historical)
Lists, boards, and timelines with custom fields let teams model workflow without a query language. Saved views synced for shared understanding. Those configurations are not portable as living Height objects, only whatever export formats you captured during the migration window.
Native macOS Desktop Client (historical)
Height offered a desktop app with notifications and Apple Silicon support while the service ran, appealing to Mac-first product teams. In 2026 a leftover app is a husk: uninstall it, remove Login Items, and clear notification permissions so macOS Tahoe does not surface phantom alerts.
Who Should Use Height?
1Former Height Workspace Admin
An engineering manager whose team lived in Height through 2025 already exported issues before the final day. In 2026 they audit GitHub for residual Height OAuth apps, confirm CSV/JSON backups are in encrypted storage, and run a retrospective so Linear projects mirror old Height taxonomy without reintroducing a dead vendor into SOC2 diagrams.
2Mac Buyer Reading Old Roundups
A founder finds Height on a 2024-early-2025 "best AI project management" list. They verify the September 24, 2025 shutdown, skip download links, and shortlist Linear for eng, Asana for cross-functional work, or Notion for docs-plus-tasks based on team shape, not nostalgia.
3IT / Security Reviewer
Security reviews Login Items, browser SSO sessions, and third-party Git apps after vendor sunsets. For Height the checklist is: uninstall desktop binary, revoke OAuth, rotate shared passwords labeled Height, mark vendor inventory discontinued effective 2025-09-24, and ensure MDM no longer deploys the package.
4Product Ops Lead Mid-Migration (historical)
During the March-September 2025 notice window, product ops mapped Height statuses to Linear workflow states, trained PMs on the new tool, and dual-ran critical projects for two sprints. That playbook remains the gold standard when any SaaS announces wind-down: export early, remap fields, retrain, then cut over.
Do Not Install Height on Mac in 2026
Height's cloud service ended on September 24, 2025. There is no supported install or onboarding path. Use the steps below only to decommission leftovers.
Confirm Service Status
Treat height.app marketing claims of live autonomous project management as historical. Official posts and independent write-ups set final service on 2025-09-24. Do not enter corporate credentials into residual login screens or phishing clones.
Remove Leftover Desktop App
Quit Height if running, drag Height.app from /Applications to Trash, empty Trash, and remove it from Login Items and Dock. Optionally delete ~/Library/Application Support folders tied to Height.
Revoke Integrations
In GitHub, GitLab, Google Workspace, and Slack admin consoles, revoke OAuth apps, bots, or incoming webhooks named Height. Rotate tokens that may have been shared in CI.
Migrate Archives to an Active Tool
Import preserved exports into Linear, Asana, Notion, or Shortcut. Rebuild automations natively. Do not wait for an unannounced Height reboot.
Pro Tips
- • Assume blog download links are unsafe or useless even if a DMG still opens.
- • Keep a screenshot of the shutdown notice in your vendor risk archive.
- • Prefer tools with public 2026 release notes and status pages before the next multi-year commitment.
Configuration Tips
Preserve Offline Exports
Store pre-shutdown exports in encrypted team storage with a field-mapping README. Cloud-only archives that depended on Height APIs are gone.
Rebuild Automations Elsewhere
Map triage, Git status moves, and stale-item sweeps to Linear workflows, GitHub Actions, or iPaaS recipes so process knowledge survives the vendor.
Clean macOS Artifacts
Spotlight-search Height, clear notification permissions, and remove Share extensions if any remain after uninstall.
Update Internal Docs
Replace Height links in onboarding wikis with the new tracker URLs so new hires are not sent to a dead product.
Alternatives to Height
Because Height is discontinued, these are migration targets, not living feature peers.
Linear
Closest match for product/engineering teams who liked Height's polish and keyboard-driven Mac app. Actively developed with strong Git linking and cycles.
Asana
Stronger for cross-functional programs and non-engineering stakeholders; mature admin controls and a free tier for small teams.
Notion
Best when docs and tasks must coexist. 2026 AI features cover some drafting/autonomy promises, with a less opinionated issue model than Linear.
Shortcut
Engineering-focused tracker that published Height migration guidance; solid Stories/Epics model for software orgs.
Todoist
Lightweight personal or tiny-team tasks if Height was overkill, reliable multi-platform execution without PM ceremony.
Pricing
Height is no longer sold. Historically it offered Free plus paid Team and Business seats (commonly cited near $6.99-$8.50 per member/month on Team annual billing and about $11.99-$14.99 on Business before shutdown). As of August 2026 there are no active tiers, trials, or enterprise contracts. Budget replacement tools at their current list prices; ignore archived Height pricing pages in old reviews.
Pros
- ✓Was a beautifully designed, AI-forward PM tool while it operated.
- ✓Native macOS client and Git sync reduced context switching for product/engineering teams.
- ✓Multi-month migration window (March announcement through September 24, 2025) gave serious teams time to export.
- ✓Public shutdown posts make current status unambiguous if you check primary sources.
- ✓Historical feature set still educates buyers on what "autonomous PM" marketing claims should actually mean.
Cons
- ✗Fully discontinued as of September 24, 2025, no workspaces, support, or cloud access.
- ✗Leftover desktop apps and OAuth grants are security and noise liabilities.
- ✗Stale SEO roundups still market Height as if it were alive.
- ✗No credible 2026 production path without switching vendors.
- ✗Chat-heavy context is hard to reconstruct if exports were incomplete.
Community & Ecosystem After Shutdown
Height's official X account announced the September 24, 2025 shutdown; founder Michaël Villar publicly marked the end of the journey. Discussion moved to migration threads on Reddit, Hacker News, and vendor blogs. There is no active Height roadmap, marketplace, or support SLAs in 2026. Treat post-sunset "Height tips" as archival unless they are explicitly migration guides. For Mac communities, the lasting lesson is vendor concentration risk: even polished native apps die when the SaaS backend dies. Mac power-user forums occasionally still mention Height in "what happened to…" threads; those threads consistently conclude with Linear recommendations. There is no meaningful Spoon, Homebrew cask maintenance, or open support SLA to join. If a recruiter or contractor lists Height as a current skill in 2026, treat it as historical stack experience similar to listing a sunsetted analytics tool, not as evidence of a live production environment.
Frequently Asked Questions about Height
About the Author
Productivity & Workflow Analyst
Expert Tips for Height
Some customers reported the shutdown felt directionally unsurprising; when evaluating AI PM tools, demand visible shipping cadence and clear financial/status communication, not only demo polish.
Height's multi-month notice window is the minimum standard to demand in vendor contracts; use export drills annually even for healthy SaaS.
Mac-native clients create false confidence, if the SaaS dies, the .app is worthless. Prefer tools where data export is tested, not assumed.
Related Technologies & Concepts
Related Topics
Sources & References
Key Verified Facts
- Height announced shutdown with final service on September 24, 2025.[cite-height-x, cite-creativerly]
- Independent coverage describes roughly $18M raised and ~3.5 years of public availability before wind-down.[cite-creativerly]
- Post-shutdown guides treat Height as discontinued and recommend active PM tools for migration.[cite-shortcut, cite-kanbanchi]
- Height's founder publicly stated the product journey had come to an end.[cite-founder-x]
- 1Height shutdown announcement on X
Accessed Aug 9, 2026
"Official: shutting down September 24th, 2025."
- 2Height.app is shutting down: Creativerly
Accessed Aug 9, 2026
"Final service date and funding context."
- 3
- 4
- 5
- 6
- 7